Skip to content

Products

One industrial reality. Products with an honest status.

Every product reads and writes the same model — Core, Graph and Memory. We start with one problem (reliability) and expand from there. Below: what exists today, and what does not yet.

Available in pilot
Part of the 90-day reliability pilot.
Early access
Software built and tested, never used with customer data yet; only by explicit agreement.

First commercial product

What we sell first, in a 90-day pilot.

Ordanis Reliability

Asset reliability: downtime, microstops, failure detection and value.

Available in pilot

Today

  • Machine state derived from telemetry; 7 stop classes; configurable microstops
  • MTBF/MTTR and baselines with versioned definitions and lineage; INSUFFICIENT_DATA instead of invented precision
  • Incident → recommendation → approval → work order → outcome → lesson → value

Limits

Not a CMMS: it connects to yours. Not yet validated on a physical PLC or with a customer.

Ordanis Reliability in depth →

Pilot foundation

Needed to connect a real line safely.

Ordanis Edge

Linux software on an industrial PC inside the plant.

Available in pilot

Today

  • Read-only OPC UA, local buffer and store-and-forward
  • Signed identity, outbound-only communication, versioned configuration with rollback

Limits

Tested against an OPC UA simulator; validation on a physical PLC in the lab is pending. Not custom hardware, and it never writes to a PLC.

Ordanis Integration Hub

Connects OT and IT: CONNECT → NORMALIZE → CONTEXTUALIZE → DISTRIBUTE.

Available in pilot

Today

  • OPC UA through the Edge, CSV/Excel import with preview and per-row lineage
  • Read-only REST and SQL connectors (allowlist, timeout, row limit)
  • Tag → signal → component → asset mapping, versioned and audited

Limits

No customer system connected yet. New connectors only for a real use case.

Ordanis Memory

The organization does not forget what it learned.

Available in pilot

Today

  • Decisions, outcomes and lessons linked to the asset
  • Search across documents, procedures, incidents and work orders with per-site permissions

Limits

No PDF text extraction and no vector search/RAG yet.

Expansion

Next land-and-expand steps, after the first pilot.

Ordanis Intelligence

Structured answers: finding, evidence, recommendation, confidence, sources and actions.

Early access

Today

  • Authorized read tools that run with the user's permissions
  • Work-order and approval drafts always reviewed by a person; evaluation set

Limits

No language model is switched on today: answers are deterministic. Never talks to a PLC.

Ordanis Factory

Production intelligence without replacing the MES.

Early access

Today

  • Versioned OEE (availability × performance × quality) with the six big losses
  • Shifts, orders, counts and quality from import, connector or counter

Limits

Not an MES. Never used with a customer.

Ordanis Cargo

Supply chain decision intelligence — not tracking.

Early access

Today

  • Suppliers, materials, purchase orders and shipments linked to the graph
  • Which shipments threaten which assets, production orders and customer orders

Limits

No live ERP/TMS connector; data by import. Never used with a customer.

Ordanis Commissioning

Specified → installed → tested → accepted → commissioned → operational.

Early access

Today

  • The same asset from project to operation, with evidence and a second signature
  • FAT/SAT, punch list and a hashed handover package

Limits

Never used with a customer.

Ordanis Build

Industrial project intelligence: expansions, new plants, DCs.

Early access

Today

  • CAPEX budget × committed × actual, milestones with slip detection
  • Contracts, risks and commissioning readiness

Limits

No BIM, site diary or ERP connector. Never used with a customer.

It starts with one problem.

Every customer starts with the reliability pilot. Other products come in when there is a real problem for them.

Request Pilot